Past Event RIMES and Myanmar DMH Advance Assessment of Hydrometeorological and Early Warning Capacities
Date: September 15 – 18, 2026

RIMES and Myanmar DMH Advance Assessment of Hydrometeorological and Early Warning Capacities

Nay Pyi Taw, Myanmar, 15–18 September 2026 — The Regional Integrated Multi-Hazard Early Warning System (RIMES), in collaboration with Myanmar’s Department of Meteorology and Hydrology (DMH) of Myanmar and the World Meteorological Organization (WMO), conducted assessment mission under the Climate Risk and Early Warning Systems (CREWS) Accelerated Support Window Programme. The mission gathered and validated information to help identify priorities for strengthening national hydrometeorological and early warning services.

Myanmar, faces hazards, including floods, flash floods, cyclones, storm surges, heavy rainfall and, droughts. Effective forecasts and warning can support preparedness, reducing disaster risks, and strengthening climate resilience.

The four-day mission built on desk review and preliminary assessment using the WMO National Capacity Assessment Tool (NCAT). Through detailed consultations with DMH management and technical personnel, the RIMES assessment team worked with DMH to validate information and review existing capacities across the hydrometeorological service delivery chain.

Validating capacities across the hydrometeorological value chain

The assessment covered the full range of NCAT thematic areas. Discussions examined institutional and governance arrangements, infrastructure, observations and data acquisition, meteorological and climate services, forecasting operations, hydrological and flood forecasting services, dissemination and communication, staff capabilities and training, and operational sustainability.

The mission also included visits to DMH’s operational facilities and technical divisions in Nay Pyi Taw. These visits allowed the assessment team to better understand existing systems, operational workflows, infrastructure, data management arrangements, and the processes supporting forecasting and warning services.

The in-country consultations provided an important opportunity to complement information gathered through the earlier desk review with direct inputs from DMH personnel and observations of operational arrangements. This validation is a key part of completing the NCAT and identifying existing strengths, priority gaps, and opportunities for future capacity development. The mission was specifically designed to validate the desk review and NCAT while reviewing operational forecasting, early warning, flood and flash-flood arrangements, data systems and stakeholder coordination.

Bringing user perspectives into the assessment

Representatives from eight national stakeholder agencies contributed perspectives from disaster management, emergency response, water resources, public administration, public information, media, and humanitarian response.

The consultation explored how different organizations currently engage with DMH, how weather, climate and hydrological information and warnings support their respective mandates, and how coordination and information-sharing take place during significant hydrometeorological events.

Stakeholders also discussed their future information and service needs, including the types of hydrometeorological information, geographic detail, lead time, communication channels, and additional information that could further support operational decision-making.

These perspectives will help ensure that the assessment considers not only the technical capacity to produce forecasts and warnings, but also how information reaches users and supports preparedness and action.

Supporting Early Warnings for All

RIMES and DMH also reviewed and discussed the Early Warnings for All (EW4All) Pillar 2 Rapid Assessment Template, complementing the NCAT process and helping identify areas relevant to strengthening Myanmar’s detection, observation, monitoring, analysis, and forecasting capacities.

The mission concluded with a discussions of preliminary observations, outstanding information needs, and the next steps for completing the assessment. The RIMES team also held an online discussion with WMO regarding the flash-flood component of the initiative.

From assessment to practical actions

Information gathered and validated during the mission will now be consolidated with the desk review and previous consultations to support completion of the Myanmar Hydrometeorological Capacity Assessment.

The findings will contribute to the preparation of an assessment report, roadmap, costed action plan, and Concept of Operations (ConOps). These outputs are intended to identify practical priorities and investment needs for strengthening Myanmar’s hydrometeorological and early warning services, with attention to operational usability, institutional sustainability, and the needs of end users.

RIMES expresses its appreciation to the Department of Meteorology and Hydrology of Myanmar, particularly its management and technical divisions, for their close cooperation throughout the mission. RIMES also thanks WMO and the 8 participating stakeholder agencies for their valuable inputs and continued collaboration in advancing hydrometeorological and early warning services in Myanmar.

October 14, 2026